PROJECT
Kingston, MA Wind Turbines
Kinston MA Wind Turbine Farm Install
Kingston Wind Commissioned February 2012, Kingston Wind is No Fossil Fuel’s flagship renewable energy development project. It is a 6MW farm comprising three Gamesa 2.0 MW G90 turbines.
As of June 30th, 2020 it has powered the equivalent of 4,309 homes a year on average. Within that same time, Kingston Wind offset a total of 67,176 metric tons of carbon dioxide emissions that would have been generated by an electric plant using fossil fuel as a fuel source. To put things in perspective, this carbon dioxide amount is the equivalent of 14,513 cars producing emissions for an entire year.